August 2014
Mon Tue Wed Thu Fri Sat Sun
« Jul   Sep »
 123
45678910
11121314151617
18192021222324
25262728293031

Month August 2014

Thirty-One Weeks

IMG_9868

Sunday, August 31

IMG_9873

IMG_9872

IMG_9871

IMG_9869

IMG_9865

IMG_9864

IMG_9863

IMG_9861

IMG_9858

IMG_9856

IMG_9853

Thirty Weeks

Davina at Polk

Davina poking out at Polk

Thirty Weeks

IMG_9850

Demo Details

Front door viewed from middle of kitchen

Front door viewed from middle of kitchen

Tape measure, caught up

Tape measure, caught up

"Kitchenette" viewed from dining room

“Kitchenette” viewed from dining room

Wall of guest bathroom and entrance to hallway/laundry room viewed from the kitchen

Wall of guest bathroom and entrance to hallway/laundry room viewed from the kitchen

Master bathroom

Master bathroom

Master bathroom, future site of tub and shower

Master bathroom, future site of tub and shower

Demo

One ten cubic yard dumpster was not enough

One ten cubic yard dumpster was not enough

Davina's belly button

Davina’s belly button

Adhesive on the original hardwood floors

Adhesive on the original hardwood floors

Walls Removed

Walls Removed

Home Work

Back Bedroom Before

Back Bedroom Before

Back Bedroom After

Back Bedroom After

Kitchen Before

Kitchen Before

Kitchen After

Kitchen After

Middle Bedroom Before

Middle Bedroom Before

Middle Bedroom After

Middle Bedroom After

Master Bedroom Before

Master Bedroom Before

Master Bedroom After

Master Bedroom After

Twenty-Eight Weeks

Homeowner

Davina Twenty-Eight Weeks

Davina Twenty-Eight Weeks